Probably they had some contractual commitments with TSMC and had to use up their N3B capacity somehow. But as soon as N3E became available it’s a much better process overall.
Ramping up production on a new die also takes time. The lower volume and requirements of the M4 as used in the iPad can give them time to mature the line for the Macs.